Having earmarked the old Cider Barn as our office for the business, we made an agreement with the builders to both batton, insulate, plaster and lay a new floor. So, in advance of their arrival it was a case of clearing out the room. Having taken the press down last year, we were left with the large wooden blocks, still in the steels, so after a bit of wriggle, Mike, Martin and Rick moved the blocks out into the garage:



We were of course going to save everything and find some future use for it all, including the old tray..

Once the big items were removed, I got in and had a good rummage with the remaining. There were lots of treasures to be found (which I have since squirreled away into the chicken shed):


I had a good sweep out and left the place tidy ready for Sully to come in and batton the room out for plasterboard:



We decided to leave the gable end as an exposed stone wall, so doubled up on insulation in the roof and floor:


The walls were boarded out and a new window put in
 (the old one came dislodged in a recent storm and was only single glazed):


And we had already run pipes and electrics into the room, which then fed under the drive to connect to the chicken shed at a later date:


The walls and ceiling got a coat of plaster:


We retained some of the old fixings:

The flooring was laid (a gift from Patrick after he was left with excess from an old job):


And we really liked the way that the old and new worked together throughout the room:



The attention to detail around the old step is brilliant:


And the new door

 (modeled on both the old stable door and those over in the barns)


- is just fab!


Now all we need to do is paint it, connect the electrics and we will have a fully functioning office!